YUCHAI ENGINE

YUCHAI ENGINE

Home / Products / POWERTRAIN / YUCHAI ENGINE / Yuchai engine spare parts Measurement valve assembly 1205710-K57P0

Yuchai engine spare parts Measurement valve assembly 1205710-K57P0

The Measurement Valve Assembly (Part No.: 1205710-K57P0) is exclusively engineered to match the original specifications of Yuchai engine series, particularly the YC6K, YC4E, and YC6L models widely used in Dongfeng, Foton, and JAC heavy-duty trucks, buses, and construction machinery. Its core parameters—24V DC operating voltage, 0.5-1.2MPa working pressure, and 6mm fuel inlet/outlet diameter—align precisely with the engine’s fuel injection system (OE part matching Yuchai’s EUP fuel pump module). The valve’s mounting flange (4-bolt pattern, 65mm bolt circle) fits seamlessly with the fuel rail, while the 180mm pre-wired harness matches the engine ECU’s (Electronic Control Unit) pinout. As an OE-matching component, it requires no adapter or wiring modification, directly replacing the old valve and complying with Yuchai’s Q/YC 3075-2020 standard

Product Attributes

Warranty: 1 YEARS ,Part name: Measurement valve assembly 1205710-K57P0

PRODUCT DESCRIPTION

01

Precise Fuel Measurement: Optimizing Engine Performance & Emissions

Built to regulate fuel supply with exceptional accuracy for Yuchai engines, this measurement valve assembly features a solenoid-driven precision spool design that ensures consistent fuel metering. It achieves a flow control accuracy of ±2% across the operating range (5-50L/h), precisely adjusting fuel delivery based on ECU signals to match engine load and speed. This precise control optimizes the air-fuel ratio, reducing fuel consumption by 3-5% and minimizing NOx and particulate emissions—helping engines comply with GB 17691-2018 National VI emission standards. The valve’s fast response time (≤30ms) ensures immediate fuel adjustment during transient conditions (e.g., acceleration, deceleration), preventing hesitation and improving engine smoothness

02

Robust Structural Design: Withstanding Engine Vibration & Pressure

Engineered to endure the harsh operating environment of Yuchai engines, the valve assembly boasts a durable structural design. The valve body is crafted from high-strength aluminum alloy (6061-T6) with a hard anodized surface, resisting corrosion and mechanical wear. The internal spool uses stainless steel (304 grade) with a polished surface finish (Ra ≤0.2μm), reducing friction and ensuring smooth operation after 100,000 cycles. A reinforced solenoid coil (copper wire winding, class H insulation) generates stable electromagnetic force, maintaining performance even with voltage fluctuations (20-28V). The assembly withstands engine vibrations up to 20g (5-2000Hz, ISO 16750-3) and working pressures up to 1.5MPa, preventing leakage or spool jamming during heavy-load operation

03

High-Temperature & Corrosion Resistance: Durability in Extreme Conditions

Designed to adapt to the extreme temperature and chemical environment of engine compartments, the measurement valve assembly exhibits exceptional resistance. The valve’s seals use fluororubber (FKM) material that maintains elasticity at operating temperatures from -40℃ (northeast China winters) to 150℃ (engine bay peak temperature), passing 500 thermal cycles (-30℃ to 130℃) without hardening or leakage. The aluminum alloy body resists corrosion from diesel fuel, biodiesel blends, and fuel additives, with no measurable weight loss after 72-hour immersion in diesel. The pre-wired harness features high-temperature PVC insulation that resists aging and abrasion, ensuring reliable signal transmission for over 80,000km of service

04

Easy Installation & Low Maintenance: Reducing Downtime

Optimized for efficient engine maintenance, the valve assembly features a user-friendly design that simplifies replacement and reduces downtime. The 4-bolt mounting flange uses M6×16 galvanized bolts (grade 8.8) that match the engine’s original mounting holes, requiring only a torque wrench (12-15N·m) for fixation. The pre-wired harness includes a weatherproof connector (AMP Superseal 2.8 series) that plugs directly into the ECU, eliminating on-site wiring. The valve’s compact dimensions (85mm×60mm×45mm) fit easily in the crowded engine bay, and clear labeling (“INLET”/“OUTLET”) prevents reverse installation. It requires no regular maintenance—thanks to the wear-resistant spool and corrosion-resistant materials—and comes with a 1-year/100,000km warranty. A single technician can complete replacement in 25 minutes or less, minimizing vehicle downtime for fleet operators

TECHNICAL SUPPORT

1. Accessories selection consultation

- Provide ** intelligent selection tools ** (such as parts matching query system), input the vehicle model VIN code or engine model to match the corresponding parts number, reducing the selection error rate.


The technical team is available online 7×12 hours to answer technical questions about accessories (such as material compatibility and installation processes).


2. Customized development support

We offer specialized R&D services for special market demands (such as heat dissipation accessories for high-temperature regions in the Middle East and dedicated suspension components for road conditions in Africa), and complete sample delivery within six weeks.


3. Training and Technical materials

Provide remote/on-site training for the customer's after-sales team (such as diagnosis of electrical control accessories and DPF regeneration operation), along with multilingual versions of the "Accessories Installation Manual" and "Troubleshooting Guide".


4. Quality Traceability and Improvement

Through the QR code traceability system (one product, one code), track the production batch of accessories and the source of raw materials, respond quickly to quality complaints and initiate improvement processes.

AFTER-SALES AND LOGISTICS SUPPORT

After-sales service

After-sales service

Quality Assurance Policy


-The warranty period for original factory parts is 12 months (counting from the date of signature for receipt), covering material defects, process issues, and man-made damage.


- Provide "Localized Express repair Service" : Cooperate with third-party repair networks in markets such as Southeast Asia and the Middle East, and deliver emergency parts to designated repair points within 4 hours.


Return and Exchange Process


-The customer is required to submit the test report (such as a third-party appraisal) within the warranty period. After confirmation by Dongfeng, a reissue or refund will be arranged within 5 working days.

Logistics support

Logistics support

Warehouse Layout


-Five major regional accessory centers have been established globally (Southeast Asia, the Middle East, Africa, South America, and Europe) to achieve "next-day delivery" for mainstream accessories (covering customers within the regions).


Emergency Logistics Plan


-Emergency parts can be directly delivered within 48 hours via the "Dongfeng Exclusive Aviation Special Line" (such as engine ECU, brake valves and other key components).


Packaging Optimization

-Use shockproof and moisture-proof packaging (such as honeycomb cartons + pearl cotton), and reinforce fragile parts (such as glass, sensors), keeping the damage rate within 0.5%.