New Energy Power parts

New Energy Power parts

Home / Products / POWERTRAIN / New Energy Power parts / Water Pump Assembly OE 1307010-KZ901 for Dongfeng New Energy | Genuine Truck Part
Main View Water Pump Assembly OE 1307010-KZ901 Dongfeng New Energy
Seal Detail View Water Pump Assembly OE 1307010-KZ901 Dongfeng New Energy
Spec Plate View Water Pump Assembly OE 1307010-KZ901 Dongfeng New Energy
bottom View Water Pump Assembly OE 1307010-KZ901 Dongfeng New Energy
Main View Water Pump Assembly OE 1307010-KZ901 Dongfeng New Energy
Seal Detail View Water Pump Assembly OE 1307010-KZ901 Dongfeng New Energy
Spec Plate View Water Pump Assembly OE 1307010-KZ901 Dongfeng New Energy
bottom View Water Pump Assembly OE 1307010-KZ901 Dongfeng New Energy

Water Pump Assembly OE 1307010-KZ901 for Dongfeng New Energy | Genuine Truck Part

This is a genuine water pump assembly (OE:1307010-KZ901) for Dongfeng New Energy trucks, delivering 20L/min high-flow cooling to prevent powertrain overheating. It fits all Dongfeng New Energy models perfectly, made of aluminum alloy + sealed plastic (Dongfeng-certified). Tests confirm it runs 500+ hours continuously with zero leakage, and its 24V DC design aligns with new energy truck electrical systems for reliable operation.

Product Attributes

AttributeDetails
OE Number1307010-KZ901
Compatible ModelsDongfeng New Energy
MaterialAluminum alloy + sealed engineering plastic
ColorSilver (main body) + black (housing) + white (connectors)
Installation MethodBolt-on (vehicle cooling system mount)
BrandDongfeng (Genuine Original)
Voltage24V DC
Flow Rate20L/min
Rated Power250W
Protection FeatureAnti-leak sealed design
ApplicationNew energy truck powertrain cooling system



PRODUCT DESCRIPTION

Side Structure View Water Pump Assembly OE 1307010-KZ901 Dongfeng New Energy
01

High-Flow Cooling & Leak-Proof Design

This water pump assembly (OE:1307010-KZ901) follows Dongfeng’s genuine standards, featuring a 20L/min high-flow impeller (ensures fast heat dissipation) and sealed aluminum alloy housing (eliminates coolant leakage). Its 24V DC power supply matches Dongfeng New Energy’s electrical system—critical for electric powertrain cooling. Unlike aftermarket pumps, its precision-molded seals resist high-pressure coolant, maintaining flow stability during long-haul transport.

Multi-Angle View Water Pump Assembly OE 1307010-KZ901 Dongfeng New Energy
02

Powertrain Overheating & Aftermarket Pump Shortcomings

It is 100% compatible with Dongfeng New Energy’s cooling system (cross-check OE 1307010-KZ901 for fitment). The pump solves pain points: low-flow aftermarket pumps (causing powertrain overheating), leaky seals (damaging electrical components), and mismatched voltage (failing to operate). It reduces cooling-related downtime by 80% for new energy fleets, protecting expensive powertrain parts.

Port Detail View Water Pump Assembly OE 1307010-KZ901 Dongfeng New Energy
03

Factory-Certified Reliability & Performance

As a critical cooling component, this assembly meets GB/T 13927-2008 industrial pump standards (third-party verified). It runs 500+ hours continuously without leakage (fleet test data) and withstands -30℃ to 100℃ temperature extremes. The 250W rated power balances cooling efficiency and energy consumption, aligning with new energy truck energy-saving requirements.

Label View Water Pump Assembly OE 1307010-KZ901 Dongfeng New Energy
04

Trusted Supplier & New Energy Fleet Support

We are a direct Dongfeng genuine parts exporter with expertise in new energy truck components. The pump is packaged in shock-proof wrapping to protect precision parts. We offer a 12-month warranty against leakage, and our 24/7 technical team provides cooling system installation guidance. Contact us for bulk pricing—we deliver globally to keep your Dongfeng New Energy fleet’s powertrain cool and reliable.

TECHNICAL SUPPORT

1. Accessories selection consultation

- Provide ** intelligent selection tools ** (such as parts matching query system), input the vehicle model VIN code or engine model to match the corresponding parts number, reducing the selection error rate.


The technical team is available online 7×12 hours to answer technical questions about accessories (such as material compatibility and installation processes).


2. Customized development support

We offer specialized R&D services for special market demands (such as heat dissipation accessories for high-temperature regions in the Middle East and dedicated suspension components for road conditions in Africa), and complete sample delivery within six weeks.


3. Training and Technical materials

Provide remote/on-site training for the customer's after-sales team (such as diagnosis of electrical control accessories and DPF regeneration operation), along with multilingual versions of the "Accessories Installation Manual" and "Troubleshooting Guide".


4. Quality Traceability and Improvement

Through the QR code traceability system (one product, one code), track the production batch of accessories and the source of raw materials, respond quickly to quality complaints and initiate improvement processes.

AFTER-SALES AND LOGISTICS SUPPORT

After-sales service

After-sales service

Quality Assurance Policy


-The warranty period for original factory parts is 12 months (counting from the date of signature for receipt), covering material defects, process issues, and man-made damage.


- Provide "Localized Express repair Service" : Cooperate with third-party repair networks in markets such as Southeast Asia and the Middle East, and deliver emergency parts to designated repair points within 4 hours.


Return and Exchange Process


-The customer is required to submit the test report (such as a third-party appraisal) within the warranty period. After confirmation by Dongfeng, a reissue or refund will be arranged within 5 working days.

Logistics support

Logistics support

Warehouse Layout


-Five major regional accessory centers have been established globally (Southeast Asia, the Middle East, Africa, South America, and Europe) to achieve "next-day delivery" for mainstream accessories (covering customers within the regions).


Emergency Logistics Plan


-Emergency parts can be directly delivered within 48 hours via the "Dongfeng Exclusive Aviation Special Line" (such as engine ECU, brake valves and other key components).


Packaging Optimization

-Use shockproof and moisture-proof packaging (such as honeycomb cartons + pearl cotton), and reinforce fragile parts (such as glass, sensors), keeping the damage rate within 0.5%.