Engine assembly

Engine assembly

Home / Products / POWERTRAIN / CUMMINS ENGINE / Engine assembly / Cummins engine spare parts Inert wheel shaft C5465709 in stocked

Cummins engine spare parts Inert wheel shaft C5465709 in stocked

The Inert Wheel Shaft (Part No.: C5465709) is a genuine OE component exclusively engineered for Cummins heavy-duty X15 and ISX15 engine series, widely applied in long-haul tractors (Peterbilt 579, Kenworth T680), mining trucks, and large generator sets. Its core parameters—220mm total length, 65mm journal diameter (for idler gear mounting), 80mm flange diameter, and 12mm keyway width—align perfectly with the engine’s idler gear (Cummins OE C5664884) and cylinder block (Cummins OE 5302888). Compliant with Cummins CES 13550 standards, the shaft’s dimensional tolerance (±0.02mm) ensures precise fit, supporting direct replacement without reaming the mounting bore or modifying the timing system

Product Attributes

Warranty: 1 YEARS ,Part name: Inert wheel shaft C5465709

PRODUCT DESCRIPTION

01

High-Precision Machining: Ensuring Stable Gear Rotation

Built as the core support component for the idler gear, this shaft features ultra-precise machining to guarantee rotational stability. The gear-mounting journal undergoes grinding with a surface roughness of Ra ≤0.1μm and a roundness error of ≤0.005mm, ensuring concentric rotation of the idler gear (runout ≤0.01mm). The keyway (12mm×8mm) is milled with a tolerance of H9, forming a tight fit with the idler gear’s key to prevent slippage during high-speed operation (engine speed up to 2100rpm). The shaft’s flange end face is lapped to a flatness of ≤0.01mm, ensuring uniform force distribution when fixed to the cylinder block—avoiding eccentric wear of the idler gear

02

High-Strength Material & Heat Treatment: Withstanding Dynamic Loads

Engineered to endure continuous dynamic loads from the idler gear, the shaft is crafted from 42CrMo alloy steel with a tensile strength of ≥1000MPa. It undergoes a specialized heat treatment process: quenching the journal and keyway areas to HRC 52-55 for wear resistance, while tempering the shaft body to HRC 30-35 for toughness. This dual-hardness design balances rigidity and flexibility, enabling the shaft to withstand 120kN radial loads (from gear meshing) without bending. The shaft also undergoes shot peening (surface stress ≥-400MPa) to enhance fatigue resistance, ensuring no cracking after 100 million load cycles—equivalent to 300,000km of operation

03

Wear & Corrosion Resistance: Durability in Harsh Engine Environments

Optimized to resist wear and corrosion in the engine’s high-temperature, oil-rich environment, the shaft integrates multiple protective features. The gear-mounting journal is coated with a 0.05mm-thick chromium nitride (CrN) layer, reducing friction coefficient by 30% and enhancing wear resistance—extending the shaft’s service life by 50% compared to uncoated alternatives. The entire shaft undergoes phosphating treatment followed by electrophoretic coating (20μm thickness), passing 1500-hour neutral salt spray testing (ASTM B117) to prevent rust. The flange’s mounting holes are tapped with precision threads (M16×2) treated with anti-seize coating, ensuring easy disassembly even after long-term use

04

Easy Installation & Cost-Efficiency: Optimizing Maintenance Operations

The inert wheel shaft is designed for efficient installation and long-term cost savings. Its precision-machined journal and keyway ensure quick alignment with the idler gear, reducing assembly time by 40%—two technicians can complete replacement in 60 minutes. The shaft’s reliable performance maintains the timing system’s accuracy, preventing idler gear misalignment that causes valve timing errors (a costly failure costing up to $8,000). As a genuine Cummins part, it eliminates the need for aftermarket modifications, ensuring compatibility with the original engine components. Backed by a 2-year/250,000km warranty, it reduces unplanned downtime for fleet operators and avoids repeated replacement costs of low-quality shafts

TECHNICAL SUPPORT

1. Accessories selection consultation

- Provide ** intelligent selection tools ** (such as parts matching query system), input the vehicle model VIN code or engine model to match the corresponding parts number, reducing the selection error rate.


The technical team is available online 7×12 hours to answer technical questions about accessories (such as material compatibility and installation processes).


2. Customized development support

We offer specialized R&D services for special market demands (such as heat dissipation accessories for high-temperature regions in the Middle East and dedicated suspension components for road conditions in Africa), and complete sample delivery within six weeks.


3. Training and Technical materials

Provide remote/on-site training for the customer's after-sales team (such as diagnosis of electrical control accessories and DPF regeneration operation), along with multilingual versions of the "Accessories Installation Manual" and "Troubleshooting Guide".


4. Quality Traceability and Improvement

Through the QR code traceability system (one product, one code), track the production batch of accessories and the source of raw materials, respond quickly to quality complaints and initiate improvement processes.

AFTER-SALES AND LOGISTICS SUPPORT

After-sales service

After-sales service

Quality Assurance Policy


-The warranty period for original factory parts is 12 months (counting from the date of signature for receipt), covering material defects, process issues, and man-made damage.


- Provide "Localized Express repair Service" : Cooperate with third-party repair networks in markets such as Southeast Asia and the Middle East, and deliver emergency parts to designated repair points within 4 hours.


Return and Exchange Process


-The customer is required to submit the test report (such as a third-party appraisal) within the warranty period. After confirmation by Dongfeng, a reissue or refund will be arranged within 5 working days.

Logistics support

Logistics support

Warehouse Layout


-Five major regional accessory centers have been established globally (Southeast Asia, the Middle East, Africa, South America, and Europe) to achieve "next-day delivery" for mainstream accessories (covering customers within the regions).


Emergency Logistics Plan


-Emergency parts can be directly delivered within 48 hours via the "Dongfeng Exclusive Aviation Special Line" (such as engine ECU, brake valves and other key components).


Packaging Optimization

-Use shockproof and moisture-proof packaging (such as honeycomb cartons + pearl cotton), and reinforce fragile parts (such as glass, sensors), keeping the damage rate within 0.5%.