Engine accessory group

Engine accessory group

Home / Products / POWERTRAIN / RENAULT ENGINE / Engine accessory group / Dongfeng Renault engine parts High pressure oil pipe assembly 1112106-E9300

Dongfeng Renault engine parts High pressure oil pipe assembly 1112106-E9300

This high-pressure oil pipe assembly (Part No. 1112106-E9300) is exclusively engineered for Dongfeng Renault engine models, developed via 3D laser scanning of the original engine’s fuel rail and injector layout. It replicates every critical detail: pipe length (650mm), bend angles (25° and 135° for optimal routing), and connector specifications (M14×1.5 male threads for fuel rail, M12×1.25 for injectors)—all within ±0.05mm tolerance. Unlike universal high-pressure pipes that require cutting or adapter fittings, it directly connects the engine’s fuel rail to injectors without modifications, ensuring seamless alignment with adjacent components (e.g., cylinder head, wiring harness). This precise fit eliminates stress on pipe joints (a major cause of leaks) and maintains the fuel system’s original pressure dynamics, avoiding injector misfueling or engine power loss

Product Attributes

Warranty: 1 YEARS ,Part name:  High pressure oil pipe assembly 1112106-E9300 

PRODUCT DESCRIPTION

01

High-Pressure Resistance for Fuel System Stability​

Built to withstand the extreme pressure demands of Dongfeng Renault’s common rail fuel system (up to 2,000 bar), the pipe assembly features a multi-layer reinforced structure. The inner tube is made of seamless stainless steel (316L grade, 1.5mm wall thickness) that resists burst pressure up to 6,000 bar—three times the system’s operating pressure—ensuring safety even during pressure spikes. The outer layer is wrapped in high-strength aramid fiber braiding (2 layers) that enhances radial pressure resistance and prevents pipe expansion under load. Unlike single-layer pipes that deform or burst under high pressure, this reinforced design maintains structural integrity through 100,000+ engine cycles, ensuring consistent fuel delivery to injectors. Rigorous pressure testing confirms no leakage or deformation at maximum system pressure, meeting Dongfeng Renault’s strict fuel system standards

02

Leak-Proof Sealing & Vibration Dampening Design​

To prevent high-pressure fuel leaks (a critical safety hazard), the assembly integrates a dual-seal connector system. Each pipe end features a precision-machined conical seat (60° angle) that mates with the fuel rail/injector’s sealing surface, creating a metal-to-metal seal that resists pressure-induced separation. Additionally, each connector is fitted with a Viton O-ring (heat-resistant to 200°C) that provides a secondary seal against minor surface irregularities. The pipe also includes a flexible polyurethane sleeve (3mm thick) along its length that dampens engine vibration, reducing stress on pipe joints and preventing seal wear over time. Unlike rigid pipes that develop leaks from vibration fatigue, this design ensures leak-free operation for 80,000+ km, avoiding fuel waste and fire risks

03

Corrosion & Heat Resistant Materials for Durability​

Designed to endure the harsh environment of Dongfeng Renault’s engine bay (exposure to fuel, oil, coolant, and high temperatures), the pipe assembly uses corrosion-resistant materials. The inner stainless steel tube resists chemical degradation from diesel fuel additives (e.g., cetane improvers) and prevents rust from moisture contamination. The aramid fiber outer layer is coated with a heat-resistant epoxy resin that withstands temperatures up to 220°C—critical for pipes routed near exhaust manifolds or cylinder heads. The connector threads are plated with zinc-nickel alloy (8μm thickness) that passes 1,000 hours of salt spray testing without corrosion, ensuring easy disassembly during maintenance. Unlike carbon steel pipes that rust within 2–3 years, this material combination extends the assembly’s service life to 5+ years

04

Safety Compliance & Easy Installation​

The high-pressure oil pipe assembly complies with international safety standards for automotive fuel systems (ISO 4081, SAE J343) and Dongfeng Renault’s internal quality requirements. It undergoes 100% pressure testing (2,500 bar for 5 minutes) and helium leak detection (leak rate ≤ 1×10⁻⁹ mbar·L/s) before leaving the factory, ensuring zero defects. For installation, the pipe features pre-marked alignment indicators that match reference points on the engine, guiding technicians to position it correctly without guesswork. It uses OEM-specification torque values (35–40 N·m for fuel rail, 25–30 N·m for injectors) and is compatible with standard torque wrenches—no specialized tools required. Installation takes 30–45 minutes, reducing engine downtime for fleet operators. Backed by a 24-month warranty against manufacturing defects (e.g., pipe burst, seal failure, or corrosion), it provides Dongfeng Renault engine owners with reliable fuel delivery and long-term safety

TECHNICAL SUPPORT

1. Accessories selection consultation

- Provide ** intelligent selection tools ** (such as parts matching query system), input the vehicle model VIN code or engine model to match the corresponding parts number, reducing the selection error rate.


The technical team is available online 7×12 hours to answer technical questions about accessories (such as material compatibility and installation processes).


2. Customized development support

We offer specialized R&D services for special market demands (such as heat dissipation accessories for high-temperature regions in the Middle East and dedicated suspension components for road conditions in Africa), and complete sample delivery within six weeks.


3. Training and Technical materials

Provide remote/on-site training for the customer's after-sales team (such as diagnosis of electrical control accessories and DPF regeneration operation), along with multilingual versions of the "Accessories Installation Manual" and "Troubleshooting Guide".


4. Quality Traceability and Improvement

Through the QR code traceability system (one product, one code), track the production batch of accessories and the source of raw materials, respond quickly to quality complaints and initiate improvement processes.

AFTER-SALES AND LOGISTICS SUPPORT

After-sales service

After-sales service

Quality Assurance Policy


-The warranty period for original factory parts is 12 months (counting from the date of signature for receipt), covering material defects, process issues, and man-made damage.


- Provide "Localized Express repair Service" : Cooperate with third-party repair networks in markets such as Southeast Asia and the Middle East, and deliver emergency parts to designated repair points within 4 hours.


Return and Exchange Process


-The customer is required to submit the test report (such as a third-party appraisal) within the warranty period. After confirmation by Dongfeng, a reissue or refund will be arranged within 5 working days.

Logistics support

Logistics support

Warehouse Layout


-Five major regional accessory centers have been established globally (Southeast Asia, the Middle East, Africa, South America, and Europe) to achieve "next-day delivery" for mainstream accessories (covering customers within the regions).


Emergency Logistics Plan


-Emergency parts can be directly delivered within 48 hours via the "Dongfeng Exclusive Aviation Special Line" (such as engine ECU, brake valves and other key components).


Packaging Optimization

-Use shockproof and moisture-proof packaging (such as honeycomb cartons + pearl cotton), and reinforce fragile parts (such as glass, sensors), keeping the damage rate within 0.5%.