Cooling system

Cooling system

Home / Products / DONGFENG KR / Cooling system / Dongfeng KR Fan coupling assembly 1308080-KS1A1

Dongfeng KR Fan coupling assembly 1308080-KS1A1

The fan coupling assembly (Part No. 1308080-KS1A1) is tailor-made as an exact OEM replacement exclusively for Dongfeng KR series commercial vehicles, specifically matching engines like the Yuchai YC6L or Cummins ISD. It strictly adheres to the original engine’s front-end accessory drive (FEAD) specifications—featuring a 6-bolt mounting flange (bolt circle diameter: 120mm) that aligns with the engine’s water pump pulley, and a fan hub interface (spline count: 24T) compatible with Dongfeng KR’s original cooling fan (diameter: 750-800mm). The assembly’s overall length (185mm) and offset (35mm) match the engine bay layout, eliminating the need for spacer adjustments and ensuring seamless integration with the cooling system

Product Attributes

Warranty: 1 YEARS ,Part name: Fan coupling assembly 1308080-KS1A1

PRODUCT DESCRIPTION

01

Intelligent Thermostatic Speed Regulation

Equipped with a bi-metallic strip thermostat and silicone oil damping mechanism, the assembly enables automatic fan speed adjustment based on engine coolant temperature. When the coolant temperature is below 82℃, the thermostat keeps the silicone oil in the reservoir, allowing the fan to run at 30-40% of the engine speed (reducing power loss). As the temperature rises to 88-95℃, the bi-metallic strip expands to open the oil passage, letting silicone oil flow into the working chamber—increasing fan speed to 80-90% of engine speed for enhanced cooling. This intelligent regulation reduces fuel consumption by 2-3% compared to fixed-speed fans and prevents engine overheating or unnecessary energy waste

02

High-Efficiency Power Transmission & Torque Capacity

The coupling’s working chamber uses high-viscosity silicone oil (viscosity: 100,000 cSt at 25℃) and precision-machined friction plates (surface roughness Ra ≤ 0.4μm) to ensure efficient torque transfer. It has a maximum torque capacity of 280N·m and can withstand continuous operation at engine speeds up to 2,800 RPM, providing sufficient cooling airflow even under heavy engine loads (e.g., climbing slopes with full cargo). The dynamic balance grade of the assembly reaches G6.3 (per ISO 1940), minimizing vibration during high-speed operation and reducing wear on the water pump and bearing components

03

Durable Sealing & Extreme Environment Resistance

The assembly features a double-lip nitrile rubber seal (NBR material) and a stainless steel pressure plate to prevent silicone oil leakage—ensuring a service life of over 80,000 km without oil replenishment. The outer housing is made of high-strength aluminum alloy (ADC12) with a hard anodized finish, providing corrosion resistance against road salt, coolant, and engine oil (passing 500-hour salt spray testing). It operates stably in an extreme temperature range of -40℃ to 120℃, adapting to harsh conditions like cold winter plateaus or high-temperature desert transportation, without performance degradation

04

Tool-Free Installation & Low Maintenance

Designed for hassle-free installation, the assembly comes with pre-applied high-temperature thread lock (Loctite 243) on the mounting bolts and a alignment mark for quick positioning. The entire installation process takes 25-30 minutes with standard tools (socket wrench and torque wrench), requiring only torque calibration (45-50 N·m for mounting bolts) to ensure proper fit. For maintenance, the assembly’s modular design allows independent replacement of the thermostat or seal (if leakage occurs) without disassembling the entire coupling. Additionally, the absence of electronic components reduces the risk of failure, lowering long-term maintenance costs for fleet operators

TECHNICAL SUPPORT

1. Accessories selection consultation

- Provide ** intelligent selection tools ** (such as parts matching query system), input the vehicle model VIN code or engine model to match the corresponding parts number, reducing the selection error rate.


The technical team is available online 7×12 hours to answer technical questions about accessories (such as material compatibility and installation processes).


2. Customized development support

We offer specialized R&D services for special market demands (such as heat dissipation accessories for high-temperature regions in the Middle East and dedicated suspension components for road conditions in Africa), and complete sample delivery within six weeks.


3. Training and Technical materials

Provide remote/on-site training for the customer's after-sales team (such as diagnosis of electrical control accessories and DPF regeneration operation), along with multilingual versions of the "Accessories Installation Manual" and "Troubleshooting Guide".


4. Quality Traceability and Improvement

Through the QR code traceability system (one product, one code), track the production batch of accessories and the source of raw materials, respond quickly to quality complaints and initiate improvement processes.

AFTER-SALES AND LOGISTICS SUPPORT

After-sales service

After-sales service

Quality Assurance Policy


-The warranty period for original factory parts is 12 months (counting from the date of signature for receipt), covering material defects, process issues, and man-made damage.


- Provide "Localized Express repair Service" : Cooperate with third-party repair networks in markets such as Southeast Asia and the Middle East, and deliver emergency parts to designated repair points within 4 hours.


Return and Exchange Process


-The customer is required to submit the test report (such as a third-party appraisal) within the warranty period. After confirmation by Dongfeng, a reissue or refund will be arranged within 5 working days.

Logistics support

Logistics support

Warehouse Layout


-Five major regional accessory centers have been established globally (Southeast Asia, the Middle East, Africa, South America, and Europe) to achieve "next-day delivery" for mainstream accessories (covering customers within the regions).


Emergency Logistics Plan


-Emergency parts can be directly delivered within 48 hours via the "Dongfeng Exclusive Aviation Special Line" (such as engine ECU, brake valves and other key components).


Packaging Optimization

-Use shockproof and moisture-proof packaging (such as honeycomb cartons + pearl cotton), and reinforce fragile parts (such as glass, sensors), keeping the damage rate within 0.5%.