Body system

Body system

Home / Products / DONGFENG KR / Body system / Original factory DONGFENG KR cabin shell 50M14-C51GY

Original factory DONGFENG KR cabin shell 50M14-C51GY

The cabin shell (Part No. 50M14-C51GY) is engineered as an OEM-authorized replacement exclusively for DONGFENG KR series commercial vehicles, including heavy-duty trucks for logistics, freight, and construction applications. It strictly follows the original vehicle’s dimensional standards (overall size: 2420mm×2080mm×2350mm) and mounting hole layouts, perfectly aligning with the chassis frame, suspension brackets, and interior component interfaces (e.g., instrument panel brackets, seat rails, and wiring harness guides). This eliminates the need for welding adjustments or bracket modifications, ensuring seamless integration with the vehicle’s existing systems and maintaining the original structural balance and operational safety

Product Attributes

Warranty: 1 YEARS ,Part name: cabin shell 50M14-C51GY

PRODUCT DESCRIPTION

01

Reinforced High-Strength Steel Structure

Constructed with high-quality Q345B cold-rolled steel sheets (thickness ranging from 1.5mm to 2.0mm), the cabin shell features a multi-point reinforced frame design. Critical stress areas—such as the front anti-collision beam, door pillars, roof crossbeams, and floor support beams—are reinforced with double-layer steel plates and triangular bracing structures, enhancing overall torsional rigidity (torsional stiffness: 3200N·m/°) and impact resistance. It complies with ECE R29 cab crash safety regulations, capable of withstanding a front impact force of 75kN without severe deformation, effectively protecting the driver’s survival space in accident scenarios

02

Durable Surface Coating & Finish

The cabin shell undergoes a professional 4-step coating process (degreasing → phosphating → electrophoretic primer → topcoat) to ensure long-term corrosion resistance and aesthetic durability. The electrophoretic primer forms a uniform anti-rust layer (passing 480-hour neutral salt spray testing with no red rust), while the topcoat (available in standard DONGFENG factory colors) offers high gloss retention (maintaining over 85% gloss after 2500 hours of UV exposure) and scratch resistance (2H pencil hardness rating). The smooth surface is also easy to clean, preventing dust and mud accumulation and keeping the cabin looking neat even in harsh working environments

03

Superior Weatherproof & Sealing Performance

Equipped with EPDM (ethylene propylene diene monomer) rubber sealing strips around door frames, window edges, and windshield mounting grooves, the cabin shell achieves an IPX5 waterproof rating. This effectively blocks rainwater intrusion during heavy downpours or high-pressure car washes, and prevents dust and sand from entering the cabin on gravel roads. Additionally, the front face of the shell is designed with an optimized air deflector structure, which reduces wind resistance by approximately 4% at highway speeds (helping lower fuel consumption) and diverts rainwater/debris away from the windshield, improving driving visibility in adverse weather

04

Pre-Punched Design for Easy Assembly

To streamline installation and maintenance, the cabin shell comes with pre-punched holes and positioning marks for all external and internal components, including headlights, rearview mirrors, door hinges, wiring harnesses, interior trim panels, and air conditioning ducts. The mounting holes have a precision tolerance of ±0.5mm, ensuring that original or aftermarket parts can be directly installed without re-drilling or adjustment. For fleet maintenance teams, this design shortens the cabin replacement time to 3-5 hours (compared to 7-9 hours for non-pre-punched shells), significantly reducing vehicle downtime and operational costs

TECHNICAL SUPPORT

1. Accessories selection consultation

- Provide ** intelligent selection tools ** (such as parts matching query system), input the vehicle model VIN code or engine model to match the corresponding parts number, reducing the selection error rate.


The technical team is available online 7×12 hours to answer technical questions about accessories (such as material compatibility and installation processes).


2. Customized development support

We offer specialized R&D services for special market demands (such as heat dissipation accessories for high-temperature regions in the Middle East and dedicated suspension components for road conditions in Africa), and complete sample delivery within six weeks.


3. Training and Technical materials

Provide remote/on-site training for the customer's after-sales team (such as diagnosis of electrical control accessories and DPF regeneration operation), along with multilingual versions of the "Accessories Installation Manual" and "Troubleshooting Guide".


4. Quality Traceability and Improvement

Through the QR code traceability system (one product, one code), track the production batch of accessories and the source of raw materials, respond quickly to quality complaints and initiate improvement processes.

AFTER-SALES AND LOGISTICS SUPPORT

After-sales service

After-sales service

Quality Assurance Policy


-The warranty period for original factory parts is 12 months (counting from the date of signature for receipt), covering material defects, process issues, and man-made damage.


- Provide "Localized Express repair Service" : Cooperate with third-party repair networks in markets such as Southeast Asia and the Middle East, and deliver emergency parts to designated repair points within 4 hours.


Return and Exchange Process


-The customer is required to submit the test report (such as a third-party appraisal) within the warranty period. After confirmation by Dongfeng, a reissue or refund will be arranged within 5 working days.

Logistics support

Logistics support

Warehouse Layout


-Five major regional accessory centers have been established globally (Southeast Asia, the Middle East, Africa, South America, and Europe) to achieve "next-day delivery" for mainstream accessories (covering customers within the regions).


Emergency Logistics Plan


-Emergency parts can be directly delivered within 48 hours via the "Dongfeng Exclusive Aviation Special Line" (such as engine ECU, brake valves and other key components).


Packaging Optimization

-Use shockproof and moisture-proof packaging (such as honeycomb cartons + pearl cotton), and reinforce fragile parts (such as glass, sensors), keeping the damage rate within 0.5%.