Body system

Body system

Home / Products / DONGFENG KINLAND / Body system / Dongfeng Kinland truck spare parts left SMJ Box Assembly 3724410-C0100

Dongfeng Kinland truck spare parts left SMJ Box Assembly 3724410-C0100

The Dongfeng Kinland Truck Left SMJ Box Assembly (Part No. 3724410-C0100) is precision-engineered to meet strict OEM specifications, ensuring seamless integration with Dongfeng Kinland heavy-duty trucks’ Shift Control Module (SMJ) system—compatible with Kinland’s long-haul, construction, and logistics variants equipped with manual or automated manual transmissions (AMTs). Its key dimensions—housing size (175mm×115mm×75mm), mounting bracket hole spacing (95mm×55mm, M6 threads), and electrical connector (10-pin waterproof plug, IP67 rating)—align perfectly with the truck’s factory left-side SMJ mounting points and wiring harnesses. The internal port layout (for shift cables, position sensors, and actuator lines) mirrors Kinland’s original design, eliminating misalignment issues that cause shift lag or signal dropouts. Validated through 220+ system tests (including shift synchronization checks, harness compatibility trials, and transmission load simulations), it reliably replaces worn SMJ boxes—restoring the truck’s original shift responsiveness without requiring ECU recalibration

Product Attributes

Warranty: 1 YEARS ,Part name: SMJ Box Assembly 3724410-C0100

PRODUCT DESCRIPTION

01

Precision Shift Control for Heavy-Duty Transmission Performance​

A core advantage of the 3724410-C0100 assembly is its ability to deliver precise, consistent shift control—critical for Kinland trucks hauling loads up to 49 tons. The box integrates precision-machined shift cable guides (tolerance ±0.05mm), Hall-effect position sensors (accuracy ±0.08mm), and low-noise electromagnetic actuators that translate driver input into smooth gear changes. It supports 6-12 speed transmission configurations (common in Kinland’s construction and logistics models), with a shift response time of ≤280ms—fast enough to minimize power loss during gear shifts, even when climbing steep grades. The assembly also includes a load-sensitive shift adjustment feature: it modifies shift timing based on engine torque (detected via ECU signals), ensuring smoother shifts under heavy loads and faster shifts when unloaded. For drivers, this precision reduces fatigue from forced shifting and prevents transmission wear caused by misaligned gear engagement

02

Rugged Housing & IP67 Protection for All-Weather Durability​

Built to withstand harsh truck operating conditions—including vibration, extreme temperatures, and chemical exposure—the 3724410-C0100 assembly uses heavy-duty materials. The outer housing is die-cast from ADC12 aluminum alloy with a matte black powder coat, delivering impact resistance (withstands 90N force without cracking) and corrosion protection (passes 750-hour salt spray tests per ASTM B117). Internal components—such as sensor circuit boards and actuator coils—are coated with a moisture-resistant conformal sealant (silicone-based), preventing damage from rain, snow, or road salt. The entire assembly is rated IP67, meaning it is dust-tight and can withstand temporary submersion in 1m of water for 30 minutes—ideal for Kinland trucks operating in flood-prone areas or muddy construction sites. Additionally, the housing features integrated heat dissipation ribs that reduce internal temperatures by 12-18°C during prolonged use (e.g., continuous shifting in urban traffic), preventing overheating of electronic components. This durability ensures the assembly operates reliably for 550,000+ kilometers (equivalent to 4+ years of heavy use), outperforming generic SMJ boxes that fail within 250,000 kilometers

03

Stable Signal Transmission & Real-Time Diagnostic Features​

The 3724410-C0100 assembly prioritizes stable signal communication between the SMJ system and the truck’s ECU, avoiding costly shift errors. It uses tinned copper wiring with EMI shielding (reducing electromagnetic interference by 85%) and gold-plated connector pins—ensuring consistent signal transmission even in high-vibration environments (up to 14g at 50-2000Hz). The assembly also includes a built-in diagnostic module that monitors key parameters: shift position accuracy, actuator current draw, and sensor voltage. If a fault is detected (e.g., sensor failure, cable binding), it sends a fault code to the ECU, triggering a dashboard warning light and storing the code for retrieval via a standard OBD scanner. This feature simplifies troubleshooting: technicians can identify issues in minutes, rather than hours of manual inspection, reducing repair time by 35%. For fleet operators, this proactive diagnostics capability minimizes unplanned downtime, ensuring trucks stay on schedule for deliveries or construction tasks

04

Tool-Free Drop-In Installation for Minimized Downtime​

The 3724410-C0100 assembly is designed for hassle-free, drop-in installation—no specialized tools or technical expertise required. It comes fully pre-assembled with all necessary hardware: 4 stainless steel mounting bolts (M6×14mm), a pre-wired 10-pin connector (color-coded to match Kinland’s factory harness), and EPDM rubber gaskets (to seal the housing against moisture). The shift cable ports feature quick-release locking clips, allowing technicians to attach existing cables without adjusting tension or length. Installation takes 25-40 minutes for a single technician using only a socket wrench and screwdriver—no ECU programming or system calibration is needed, as the assembly’s internal settings (shift thresholds, sensor offsets) are pre-configured to Kinland’s OEM standards. After installation, a 5-minute test drive (verifying smooth gear changes across all speeds) confirms functionality. For fleet managers, this quick installation reduces labor costs and ensures trucks return to service faster—critical for maintaining productivity in time-sensitive operations

TECHNICAL SUPPORT

1. Accessories selection consultation

- Provide ** intelligent selection tools ** (such as parts matching query system), input the vehicle model VIN code or engine model to match the corresponding parts number, reducing the selection error rate.


The technical team is available online 7×12 hours to answer technical questions about accessories (such as material compatibility and installation processes).


2. Customized development support

We offer specialized R&D services for special market demands (such as heat dissipation accessories for high-temperature regions in the Middle East and dedicated suspension components for road conditions in Africa), and complete sample delivery within six weeks.


3. Training and Technical materials

Provide remote/on-site training for the customer's after-sales team (such as diagnosis of electrical control accessories and DPF regeneration operation), along with multilingual versions of the "Accessories Installation Manual" and "Troubleshooting Guide".


4. Quality Traceability and Improvement

Through the QR code traceability system (one product, one code), track the production batch of accessories and the source of raw materials, respond quickly to quality complaints and initiate improvement processes.

AFTER-SALES AND LOGISTICS SUPPORT

After-sales service

After-sales service

Quality Assurance Policy


-The warranty period for original factory parts is 12 months (counting from the date of signature for receipt), covering material defects, process issues, and man-made damage.


- Provide "Localized Express repair Service" : Cooperate with third-party repair networks in markets such as Southeast Asia and the Middle East, and deliver emergency parts to designated repair points within 4 hours.


Return and Exchange Process


-The customer is required to submit the test report (such as a third-party appraisal) within the warranty period. After confirmation by Dongfeng, a reissue or refund will be arranged within 5 working days.

Logistics support

Logistics support

Warehouse Layout


-Five major regional accessory centers have been established globally (Southeast Asia, the Middle East, Africa, South America, and Europe) to achieve "next-day delivery" for mainstream accessories (covering customers within the regions).


Emergency Logistics Plan


-Emergency parts can be directly delivered within 48 hours via the "Dongfeng Exclusive Aviation Special Line" (such as engine ECU, brake valves and other key components).


Packaging Optimization

-Use shockproof and moisture-proof packaging (such as honeycomb cartons + pearl cotton), and reinforce fragile parts (such as glass, sensors), keeping the damage rate within 0.5%.