Body system

Body system

Home / Products / DONGFENG KL / Body system / Dongfeng KL truck parts controller and communication interface Shielded wire assembly 7915070-C3300

Dongfeng KL truck parts controller and communication interface Shielded wire assembly 7915070-C3300

The Controller and Communication Interface Shielded Wire Assembly (Part No.: 7915070-C3300) is a genuine OE component exclusively engineered for Dongfeng KL heavy-duty trucks, covering 6×4, 8×4, and 4×2 configurations with advanced electronic control systems. Its core parameters—4.2m total length, 0.35mm² conductor cross-section, CAN FD-compliant, 50Ω impedance, and multi-pin AMP connectors—seamlessly match the truck’s ECU (Dongfeng OE 3601010-C3300), TCU (Dongfeng OE 3765010-C3300), and multi-functional display (Dongfeng OE 7915110-C3300). Compliant with Dongfeng Q/320201 DF135-2024 and ISO 11898-2 standards, the assembly’s connector pinouts and wire routing align perfectly with the KL’s pre-installed loom, enabling plug-and-play integration without rewiring

Product Attributes

Warranty: 1 YEARS ,Part name: controller and communication interface Shielded wire assembly 7915070-C3300

PRODUCT DESCRIPTION

01

Dual-Layer Shielding: Ensuring Interference-Free Signal Transmission

Built as the backbone of the truck’s communication network, this shielded wire assembly features industry-leading anti-interference design. It adopts a dual-layer shielding structure: an inner 95% tinned copper braid and an outer aluminum foil wrap, which together block 98% of electromagnetic interference (EMI) and radio frequency interference (RFI) from the engine, alternator, and 4G/GPS systems. The shielding effectiveness reaches ≥85dB at 1GHz, ensuring stable CAN FD signal transmission with a data rate of up to 5Mbps—critical for real-time communication between controllers. A drain wire (tinned copper) grounds the shielding, diverting interference to the cab frame and preventing signal distortion that causes control system malfunctions (repair costs up to $1,200)

02

High-Durability Insulation & Conductor: Withstanding Cab Conditions

Engineered for long-term reliability in harsh truck environments, the 7915070-C3300 assembly uses premium insulation and conductor materials. The conductors are made of oxygen-free copper (OFC) with 7×0.25mm strands, offering low resistance (≤0.05Ω/m) and high tensile strength (150MPa), resisting breakage from cab vibration. The insulation is cross-linked polyethylene (XLPE) with a 0.8mm thickness, achieving a temperature rating of -40℃ to 125℃—adapting to extreme cold and heat from adjacent engine components. The XLPE insulation is also oil-resistant (resisting diesel and transmission fluid) and abrasion-resistant (passing 10,000-cycle rubbing testing), preventing insulation damage that leads to short circuits

03

Weatherproof & Vibration-Resistant Design: Enhancing Reliability

Optimized to endure the dynamic and harsh conditions of truck operation, the assembly integrates weatherproof and vibration-resistant features. The multi-pin connectors (AMP 1-967648-1) feature HNBR rubber seals, achieving IP67 protection—resisting water ingress and dust accumulation in engine bays or under-dash areas. The wire loom is wrapped in a flexible nylon braid that absorbs vibration (10-500Hz) from the truck’s chassis, preventing the wires from rubbing against metal components and causing wear. A strain relief boot at each connector end reinforces the wire-conductor junction, resisting pulling forces (up to 50N) that could disconnect the interface. These features ensure reliable performance in off-road, construction, and long-haul scenarios

04

Easy Installation & Cost-Efficiency: Optimizing Electronic Maintenance

This shielded wire assembly is designed for efficient installation and long-term cost savings for Dongfeng KL operators. The pre-labeled wires and color-coded connectors (compliant with DIN 47100) allow a single technician to complete replacement in 60 minutes—no specialized crimping or testing tools needed, as it auto-syncs with the truck’s CAN network. The OE-compatible design eliminates compatibility issues common with aftermarket wires, which often cause controller errors or communication failures. By ensuring stable signal transmission, it extends the service life of electronic components (ECU/TCU) by 30% and reduces diagnostic time for electrical issues (costing $150/hour). Backed by a 2-year/200,000km Dongfeng warranty, it provides predictable maintenance expenses and enhances the reliability of the truck’s electronic control system

TECHNICAL SUPPORT

1. Accessories selection consultation

- Provide ** intelligent selection tools ** (such as parts matching query system), input the vehicle model VIN code or engine model to match the corresponding parts number, reducing the selection error rate.


The technical team is available online 7×12 hours to answer technical questions about accessories (such as material compatibility and installation processes).


2. Customized development support

We offer specialized R&D services for special market demands (such as heat dissipation accessories for high-temperature regions in the Middle East and dedicated suspension components for road conditions in Africa), and complete sample delivery within six weeks.


3. Training and Technical materials

Provide remote/on-site training for the customer's after-sales team (such as diagnosis of electrical control accessories and DPF regeneration operation), along with multilingual versions of the "Accessories Installation Manual" and "Troubleshooting Guide".


4. Quality Traceability and Improvement

Through the QR code traceability system (one product, one code), track the production batch of accessories and the source of raw materials, respond quickly to quality complaints and initiate improvement processes.

AFTER-SALES AND LOGISTICS SUPPORT

After-sales service

After-sales service

Quality Assurance Policy


-The warranty period for original factory parts is 12 months (counting from the date of signature for receipt), covering material defects, process issues, and man-made damage.


- Provide "Localized Express repair Service" : Cooperate with third-party repair networks in markets such as Southeast Asia and the Middle East, and deliver emergency parts to designated repair points within 4 hours.


Return and Exchange Process


-The customer is required to submit the test report (such as a third-party appraisal) within the warranty period. After confirmation by Dongfeng, a reissue or refund will be arranged within 5 working days.

Logistics support

Logistics support

Warehouse Layout


-Five major regional accessory centers have been established globally (Southeast Asia, the Middle East, Africa, South America, and Europe) to achieve "next-day delivery" for mainstream accessories (covering customers within the regions).


Emergency Logistics Plan


-Emergency parts can be directly delivered within 48 hours via the "Dongfeng Exclusive Aviation Special Line" (such as engine ECU, brake valves and other key components).


Packaging Optimization

-Use shockproof and moisture-proof packaging (such as honeycomb cartons + pearl cotton), and reinforce fragile parts (such as glass, sensors), keeping the damage rate within 0.5%.